EN

Çevir:

Smart BIM
Smart BIM
  • HOME PAGE
  • ABOUT US
    • OUR COMPANY
    • OUR TEAM
  • SERVICES
    • BIM MANAGEMENT
    • STRUCTURAL DESIGN
    • GEOTECHNICAL DESIGN
    • PROJECT MANAGEMENT
  • PROJECTS
    • ON GOING PROJECTS
    • COMPLETED PROJECTS
  • REFERENCES
  • CONTACT US
  • Daha fazlası
    • HOME PAGE
    • ABOUT US
      • OUR COMPANY
      • OUR TEAM
    • SERVICES
      • BIM MANAGEMENT
      • STRUCTURAL DESIGN
      • GEOTECHNICAL DESIGN
      • PROJECT MANAGEMENT
    • PROJECTS
      • ON GOING PROJECTS
      • COMPLETED PROJECTS
    • REFERENCES
    • CONTACT US

EN

  • HOME PAGE
  • ABOUT US
    • OUR COMPANY
    • OUR TEAM
  • SERVICES
    • BIM MANAGEMENT
    • STRUCTURAL DESIGN
    • GEOTECHNICAL DESIGN
    • PROJECT MANAGEMENT
  • PROJECTS
    • ON GOING PROJECTS
    • COMPLETED PROJECTS
  • REFERENCES
  • CONTACT US

PROJECT MANAGEMENT

CONTRACT MANAGEMENT

PLANNING & COST CONTROL

PLANNING & COST CONTROL

CLAIMS,

ARBITRATION-DEFENDING

FIDIC


Contract management is the process of managing contract creation, execution and analysis to maximize operational and financial performance at an organization, all while reducing financial risk. Organizations encounter an ever-increasing amount of pressure to reduce costs and improve company performance. Co

CLAIMS,

ARBITRATION-DEFENDING

FIDIC


Contract management is the process of managing contract creation, execution and analysis to maximize operational and financial performance at an organization, all while reducing financial risk. Organizations encounter an ever-increasing amount of pressure to reduce costs and improve company performance. Contract management proves to be a very time-consuming element of business, which facilitates the need for effective and automated contract management system.

PLANNING & COST CONTROL

PLANNING & COST CONTROL

PLANNING & COST CONTROL

PRIMAVERA P6

TILOS

MS PROJECT

4D BIM (NAVISWORKS)


Construction planning is a fundamental and challenging activity in the management and execution of construction projects. It involves the choice of technology, the definition of work tasks, the estimation of the required resources and durations for individual tasks, and the identification of a

PRIMAVERA P6

TILOS

MS PROJECT

4D BIM (NAVISWORKS)


Construction planning is a fundamental and challenging activity in the management and execution of construction projects. It involves the choice of technology, the definition of work tasks, the estimation of the required resources and durations for individual tasks, and the identification of any interactions among the different work tasks. A good construction plan is the basis for developing the budget and the schedule for work. Developing the construction plan is a critical task in the management of construction, even if the plan is not written or otherwise formally recorded. In addition to these technical aspects of construction planning, it may also be necessary to make organizational decisions about the relationships between project participants and even which organizations to include in a project. For example, the extent to which sub-contractors will be used on a project is often determined during construction planning. 

DOCUMENT MANAGEMENT

PLANNING & COST CONTROL

DOCUMENT MANAGEMENT

ACONEX       PROJECT WISE

BIM 360      GTEAM        M-FILES

E-ROOM        EBA     VAULT



Document management, often referred to as Document Management Systems (DMS), is the use of a computer system and software to store, manage and track electronic documents and electronic images of paper based information captured through the use of a docume

ACONEX       PROJECT WISE

BIM 360      GTEAM        M-FILES

E-ROOM        EBA     VAULT



Document management, often referred to as Document Management Systems (DMS), is the use of a computer system and software to store, manage and track electronic documents and electronic images of paper based information captured through the use of a document scanner. 

Document management is how your organization stores, manages and tracks its electronic documents.

According to ISO 12651-2, a document is "recorded information or object which can be treated as a unit". While this sounds a little complicated, it is quite simply what you have been using to create, distribute and use for years.

NEW ERA of PROJECT MANAGEMENT

3D BIM (MODELING)

3D BIM (MODELING)

3D BIM (MODELING)



Intellegent Models.



The BIM model we produce is a highly accurate representation of the materials and geometry that will go into the job.  These BIM models can be combined with other systems models for clash detection and constructability.  These BIM models can be used for a robust construction-caliber quantity-takeoff. These BIM models can even be used for fabrication.

4D BIM (TIMING)

3D BIM (MODELING)

3D BIM (MODELING)



Workschedule Integrated Models.



Work scheduling can be carried out with greater awareness of the constructive dynamics involved, by comparing the work status to the estimated completion times; and for each single activity and constructive element of the work, in order to finish the construction job

5D BIM (COST)

3D BIM (MODELING)

5D BIM (COST)



Cost & Cash Flow Integrated Models



A careful analysis of costs and resource utilization can lead to a timely check of the costs to be borne, and the margins of earnings